CONSTRUCTION PICTURES

Electrical complete & studs ready to be installed
Walls starting to be built
Volunteers standing studs for walls
Partner of MRB construction volunteering his time, heading up wall crew
Volunteer caulking holes in existing column
Opening down to basement & boxes to be stored
Painting of bedroom underway & drywall patched
Drywall & painting underway
Drywall enclosure around mechanical equipment
Floor painted with first coat
Even one of the director's Moms puts in some volunteer time!
Doors being primed and painted in the front yard
Storage area under the front porch was a solution to get yard equipment out of the basement
Doors still underway
Flair & Jer Drywall crew.
More painting!
Volunteers assemble a wardrobe to hold cleaning supplies
Bree finishes up sewing the pillows!

| Home | Daisy's Basement | Presentation Drawings | Before Pictures | After Pictures |